{"id":4060,"date":"2025-10-03T10:24:06","date_gmt":"2025-10-03T10:24:06","guid":{"rendered":"https:\/\/youarepakistan.com.pk\/?p=4060"},"modified":"2025-10-03T10:34:11","modified_gmt":"2025-10-03T10:34:11","slug":"pre-feasibility-of-karachi-hyderabad-motorway-project-completes","status":"publish","type":"post","link":"https:\/\/youarepakistan.com.pk\/index.php\/2025\/10\/03\/pre-feasibility-of-karachi-hyderabad-motorway-project-completes\/","title":{"rendered":"Pre-feasibility of Karachi-Hyderabad motorway project completes"},"content":{"rendered":"\n<p>ISLAMABAD, Oct 2 (APP): The National Engineering Services Pakistan (NESPAK) has completed the pre-feasibility study of the newly proposed Karachi-Hyderabad Motorway (M-10), a major infrastructure project aimed at improving connectivity across Sindh and beyond.<\/p>\n\n\n\n<p>According to documents available with Wealth Pakistan, the National Highway Authority (NHA) engaged NESPAK to carry out the detailed design and commercial feasibility study on a fast-track basis. NESPAK successfully completed the pre-feasibility within the stipulated time.<\/p>\n\n\n\n<p>The NHA has proposed a 168-kilometer, six-lane motorway that would connect four major highways \u2013 N-25, N-5, N-55, and M-9.<\/p>\n\n\n\n<p>The M-10 will directly link Karachi with the under-construction M-6 Motorway at Jamshoro, passing through the Kirthar Mountain Range.<\/p>\n\n\n\n<p>The M-6 project, estimated at Rs363 billion, is currently in the tendering stage after approval by the Executive Committee of the National Economic Council (ECNEC).<\/p>\n\n\n\n<p>Following the completion of pre-feasibility, NESPAK has begun work on the final commercial feasibility study, which is currently underway.<\/p>\n\n\n\n<p>As per initial estimates, the M-10 project is expected to cost around Rs254 billion. It will be built in two sections: Section-I (150 km) will start from the endpoint of M-6 at Hyderabad and extend to Hub Chowki, while Section-II (18 km) will run from Hub Chowki to ICI Chowk in Karachi, partly elevated and partly at grade.<\/p>\n\n\n\n<p>The six-lane motorway will feature 10 interchanges and be designed for speeds of 60, 80, and 100 km per hour.<\/p>\n\n\n\n<p>NHA spokesperson Mazhar Hussain told Wealth Pakistan that once NESPAK completed the commercial feasibility, PC-I and PC-II would be prepared for board approval before the matter is forwarded to ECNEC for final clearance.<\/p>\n\n\n\n<p>He said the project would significantly improve road connectivity within Sindh and also link the province directly to Balochistan and Punjab.<\/p>\n\n\n\n<p>The motorway, he added, will enhance trade and transportation efficiency nationwide.<\/p>\n\n\n\n<p>Hussain further noted that the M-10 would help to divert heavy goods transport away from Karachi\u2019s main arteries, thereby reducing pressure on urban traffic.<\/p>\n\n\n\n<p>\u201cUnder this plan, a direct high-speed link between the port and the national motorway network will bypass city traffic, automatically easing the traffic load in Karachi,\u201d he explained.<\/p>\n\n\n\n<p>He emphasized that both the M-6 and M-10 motorway projects would serve as catalysts for economic growth by improving logistics and connectivity across the country.<\/p>\n","protected":false},"excerpt":{"rendered":"<p class=\"text-justify mb-2\" >ISLAMABAD, Oct 2 (APP): The National Engineering Services Pakistan (NESPAK) has completed the pre-feasibility study of the newly proposed Karachi-Hyderabad Motorway (M-10), a major infrastructure project aimed at improving connectivity across Sindh and beyond. According to documents available with Wealth Pakistan, the National Highway Authority [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":4061,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[],"class_list":["post-4060","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-business"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Pre-feasibility of Karachi-Hyderabad motorway project completes - You Are Pakistan<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/youarepakistan.com.pk\/index.php\/2025\/10\/03\/pre-feasibility-of-karachi-hyderabad-motorway-project-completes\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pre-feasibility of Karachi-Hyderabad motorway project completes - You Are Pakistan\" \/>\n<meta property=\"og:description\" content=\"ISLAMABAD, Oct 2 (APP): The National Engineering Services Pakistan (NESPAK) has completed the pre-feasibility study of the newly proposed Karachi-Hyderabad Motorway (M-10), a major infrastructure project aimed at improving connectivity across Sindh and beyond. According to documents available with Wealth Pakistan, the National Highway Authority [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/youarepakistan.com.pk\/index.php\/2025\/10\/03\/pre-feasibility-of-karachi-hyderabad-motorway-project-completes\/\" \/>\n<meta property=\"og:site_name\" content=\"You Are Pakistan\" \/>\n<meta property=\"article:published_time\" content=\"2025-10-03T10:24:06+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-03T10:34:11+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/youarepakistan.com.pk\/wp-content\/uploads\/2025\/10\/3.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"300\" \/>\n\t<meta property=\"og:image:height\" content=\"168\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"News Desk\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"News Desk\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/youarepakistan.com.pk\/index.php\/2025\/10\/03\/pre-feasibility-of-karachi-hyderabad-motorway-project-completes\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/youarepakistan.com.pk\/index.php\/2025\/10\/03\/pre-feasibility-of-karachi-hyderabad-motorway-project-completes\/\"},\"author\":{\"name\":\"News Desk\",\"@id\":\"https:\/\/youarepakistan.com.pk\/#\/schema\/person\/4b863689f7367867568709a45d74fa49\"},\"headline\":\"Pre-feasibility of Karachi-Hyderabad motorway project completes\",\"datePublished\":\"2025-10-03T10:24:06+00:00\",\"dateModified\":\"2025-10-03T10:34:11+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/youarepakistan.com.pk\/index.php\/2025\/10\/03\/pre-feasibility-of-karachi-hyderabad-motorway-project-completes\/\"},\"wordCount\":373,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/youarepakistan.com.pk\/index.php\/2025\/10\/03\/pre-feasibility-of-karachi-hyderabad-motorway-project-completes\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/youarepakistan.com.pk\/wp-content\/uploads\/2025\/10\/3.jpeg\",\"articleSection\":[\"Business\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/youarepakistan.com.pk\/index.php\/2025\/10\/03\/pre-feasibility-of-karachi-hyderabad-motorway-project-completes\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/youarepakistan.com.pk\/index.php\/2025\/10\/03\/pre-feasibility-of-karachi-hyderabad-motorway-project-completes\/\",\"url\":\"https:\/\/youarepakistan.com.pk\/index.php\/2025\/10\/03\/pre-feasibility-of-karachi-hyderabad-motorway-project-completes\/\",\"name\":\"Pre-feasibility of Karachi-Hyderabad motorway project completes - You Are Pakistan\",\"isPartOf\":{\"@id\":\"https:\/\/youarepakistan.com.pk\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/youarepakistan.com.pk\/index.php\/2025\/10\/03\/pre-feasibility-of-karachi-hyderabad-motorway-project-completes\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/youarepakistan.com.pk\/index.php\/2025\/10\/03\/pre-feasibility-of-karachi-hyderabad-motorway-project-completes\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/youarepakistan.com.pk\/wp-content\/uploads\/2025\/10\/3.jpeg\",\"datePublished\":\"2025-10-03T10:24:06+00:00\",\"dateModified\":\"2025-10-03T10:34:11+00:00\",\"author\":{\"@id\":\"https:\/\/youarepakistan.com.pk\/#\/schema\/person\/4b863689f7367867568709a45d74fa49\"},\"breadcrumb\":{\"@id\":\"https:\/\/youarepakistan.com.pk\/index.php\/2025\/10\/03\/pre-feasibility-of-karachi-hyderabad-motorway-project-completes\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/youarepakistan.com.pk\/index.php\/2025\/10\/03\/pre-feasibility-of-karachi-hyderabad-motorway-project-completes\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/youarepakistan.com.pk\/index.php\/2025\/10\/03\/pre-feasibility-of-karachi-hyderabad-motorway-project-completes\/#primaryimage\",\"url\":\"https:\/\/youarepakistan.com.pk\/wp-content\/uploads\/2025\/10\/3.jpeg\",\"contentUrl\":\"https:\/\/youarepakistan.com.pk\/wp-content\/uploads\/2025\/10\/3.jpeg\",\"width\":300,\"height\":168},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/youarepakistan.com.pk\/index.php\/2025\/10\/03\/pre-feasibility-of-karachi-hyderabad-motorway-project-completes\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/youarepakistan.com.pk\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Pre-feasibility of Karachi-Hyderabad motorway project completes\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/youarepakistan.com.pk\/#website\",\"url\":\"https:\/\/youarepakistan.com.pk\/\",\"name\":\"You Are Pakistan\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/youarepakistan.com.pk\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/youarepakistan.com.pk\/#\/schema\/person\/4b863689f7367867568709a45d74fa49\",\"name\":\"News Desk\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/4a0808bd88fedaa8fc16c17134f26df0029691723728805f09681cad9382a636?s=96&d=mm&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/4a0808bd88fedaa8fc16c17134f26df0029691723728805f09681cad9382a636?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/4a0808bd88fedaa8fc16c17134f26df0029691723728805f09681cad9382a636?s=96&d=mm&r=g\",\"caption\":\"News Desk\"},\"sameAs\":[\"https:\/\/youarepakistan.com.pk\/\"],\"url\":\"https:\/\/youarepakistan.com.pk\/index.php\/author\/news-desk\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Pre-feasibility of Karachi-Hyderabad motorway project completes - You Are Pakistan","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/youarepakistan.com.pk\/index.php\/2025\/10\/03\/pre-feasibility-of-karachi-hyderabad-motorway-project-completes\/","og_locale":"en_US","og_type":"article","og_title":"Pre-feasibility of Karachi-Hyderabad motorway project completes - You Are Pakistan","og_description":"ISLAMABAD, Oct 2 (APP): The National Engineering Services Pakistan (NESPAK) has completed the pre-feasibility study of the newly proposed Karachi-Hyderabad Motorway (M-10), a major infrastructure project aimed at improving connectivity across Sindh and beyond. According to documents available with Wealth Pakistan, the National Highway Authority [&hellip;]","og_url":"https:\/\/youarepakistan.com.pk\/index.php\/2025\/10\/03\/pre-feasibility-of-karachi-hyderabad-motorway-project-completes\/","og_site_name":"You Are Pakistan","article_published_time":"2025-10-03T10:24:06+00:00","article_modified_time":"2025-10-03T10:34:11+00:00","og_image":[{"width":300,"height":168,"url":"http:\/\/youarepakistan.com.pk\/wp-content\/uploads\/2025\/10\/3.jpeg","type":"image\/jpeg"}],"author":"News Desk","twitter_card":"summary_large_image","twitter_misc":{"Written by":"News Desk","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/youarepakistan.com.pk\/index.php\/2025\/10\/03\/pre-feasibility-of-karachi-hyderabad-motorway-project-completes\/#article","isPartOf":{"@id":"https:\/\/youarepakistan.com.pk\/index.php\/2025\/10\/03\/pre-feasibility-of-karachi-hyderabad-motorway-project-completes\/"},"author":{"name":"News Desk","@id":"https:\/\/youarepakistan.com.pk\/#\/schema\/person\/4b863689f7367867568709a45d74fa49"},"headline":"Pre-feasibility of Karachi-Hyderabad motorway project completes","datePublished":"2025-10-03T10:24:06+00:00","dateModified":"2025-10-03T10:34:11+00:00","mainEntityOfPage":{"@id":"https:\/\/youarepakistan.com.pk\/index.php\/2025\/10\/03\/pre-feasibility-of-karachi-hyderabad-motorway-project-completes\/"},"wordCount":373,"commentCount":0,"image":{"@id":"https:\/\/youarepakistan.com.pk\/index.php\/2025\/10\/03\/pre-feasibility-of-karachi-hyderabad-motorway-project-completes\/#primaryimage"},"thumbnailUrl":"https:\/\/youarepakistan.com.pk\/wp-content\/uploads\/2025\/10\/3.jpeg","articleSection":["Business"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/youarepakistan.com.pk\/index.php\/2025\/10\/03\/pre-feasibility-of-karachi-hyderabad-motorway-project-completes\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/youarepakistan.com.pk\/index.php\/2025\/10\/03\/pre-feasibility-of-karachi-hyderabad-motorway-project-completes\/","url":"https:\/\/youarepakistan.com.pk\/index.php\/2025\/10\/03\/pre-feasibility-of-karachi-hyderabad-motorway-project-completes\/","name":"Pre-feasibility of Karachi-Hyderabad motorway project completes - You Are Pakistan","isPartOf":{"@id":"https:\/\/youarepakistan.com.pk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/youarepakistan.com.pk\/index.php\/2025\/10\/03\/pre-feasibility-of-karachi-hyderabad-motorway-project-completes\/#primaryimage"},"image":{"@id":"https:\/\/youarepakistan.com.pk\/index.php\/2025\/10\/03\/pre-feasibility-of-karachi-hyderabad-motorway-project-completes\/#primaryimage"},"thumbnailUrl":"https:\/\/youarepakistan.com.pk\/wp-content\/uploads\/2025\/10\/3.jpeg","datePublished":"2025-10-03T10:24:06+00:00","dateModified":"2025-10-03T10:34:11+00:00","author":{"@id":"https:\/\/youarepakistan.com.pk\/#\/schema\/person\/4b863689f7367867568709a45d74fa49"},"breadcrumb":{"@id":"https:\/\/youarepakistan.com.pk\/index.php\/2025\/10\/03\/pre-feasibility-of-karachi-hyderabad-motorway-project-completes\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/youarepakistan.com.pk\/index.php\/2025\/10\/03\/pre-feasibility-of-karachi-hyderabad-motorway-project-completes\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/youarepakistan.com.pk\/index.php\/2025\/10\/03\/pre-feasibility-of-karachi-hyderabad-motorway-project-completes\/#primaryimage","url":"https:\/\/youarepakistan.com.pk\/wp-content\/uploads\/2025\/10\/3.jpeg","contentUrl":"https:\/\/youarepakistan.com.pk\/wp-content\/uploads\/2025\/10\/3.jpeg","width":300,"height":168},{"@type":"BreadcrumbList","@id":"https:\/\/youarepakistan.com.pk\/index.php\/2025\/10\/03\/pre-feasibility-of-karachi-hyderabad-motorway-project-completes\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/youarepakistan.com.pk\/"},{"@type":"ListItem","position":2,"name":"Pre-feasibility of Karachi-Hyderabad motorway project completes"}]},{"@type":"WebSite","@id":"https:\/\/youarepakistan.com.pk\/#website","url":"https:\/\/youarepakistan.com.pk\/","name":"You Are Pakistan","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/youarepakistan.com.pk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/youarepakistan.com.pk\/#\/schema\/person\/4b863689f7367867568709a45d74fa49","name":"News Desk","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/4a0808bd88fedaa8fc16c17134f26df0029691723728805f09681cad9382a636?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/4a0808bd88fedaa8fc16c17134f26df0029691723728805f09681cad9382a636?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/4a0808bd88fedaa8fc16c17134f26df0029691723728805f09681cad9382a636?s=96&d=mm&r=g","caption":"News Desk"},"sameAs":["https:\/\/youarepakistan.com.pk\/"],"url":"https:\/\/youarepakistan.com.pk\/index.php\/author\/news-desk\/"}]}},"_links":{"self":[{"href":"https:\/\/youarepakistan.com.pk\/index.php\/wp-json\/wp\/v2\/posts\/4060","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/youarepakistan.com.pk\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/youarepakistan.com.pk\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/youarepakistan.com.pk\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/youarepakistan.com.pk\/index.php\/wp-json\/wp\/v2\/comments?post=4060"}],"version-history":[{"count":1,"href":"https:\/\/youarepakistan.com.pk\/index.php\/wp-json\/wp\/v2\/posts\/4060\/revisions"}],"predecessor-version":[{"id":4062,"href":"https:\/\/youarepakistan.com.pk\/index.php\/wp-json\/wp\/v2\/posts\/4060\/revisions\/4062"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/youarepakistan.com.pk\/index.php\/wp-json\/wp\/v2\/media\/4061"}],"wp:attachment":[{"href":"https:\/\/youarepakistan.com.pk\/index.php\/wp-json\/wp\/v2\/media?parent=4060"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/youarepakistan.com.pk\/index.php\/wp-json\/wp\/v2\/categories?post=4060"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/youarepakistan.com.pk\/index.php\/wp-json\/wp\/v2\/tags?post=4060"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}